Configuring Equipment and Reading Sheets
Equipment is the configuration side of what operators call Reading Sheets. One piece of equipment ("a unit") has exactly one reading sheet, and the questions you put on that reading sheet are what operators fill in each day in the field.
This article covers the four things a new admin does most often:
- Copy an existing reading sheet to another location.
- Create a new unit and build its reading sheet from scratch.
- Add or edit the questions on a reading sheet.
- Set up equipment types and equipment details.
Equipment and equipment details can also be created in bulk from the Import Equipment and Import Equipment Key Details pages. Contact the EZOPS team for the import templates.
Before you startEquipment configuration is only available when all of these are true:
| Requirement | Where it is set |
|---|---|
| Equipment location widget is on for the organization | Organization Settings → Location Widgets |
| Your user has admin access | Admin → Users |
| Your role has the Equipment permission | Admin → User Role Permissions |
Go to Org Configuration → Equipment & Reading Sheets → Equipment. This opens the Manage Equipment page, which has three collapsible panels:
| Panel | What it is for |
|---|---|
| Equipment Types | The categories of machinery (Compressor, Pump, Engine, etc.) and the details tracked for each |
| Equipment Details | The library of detail fields that types are built from — EZ Ops Defaults, Custom, and Deleted |
| Manage Equipment on Location | Pick Field Locations or Plants, search for a site, and click the row to open that site's equipment |
The same Equipment & Reading Sheets menu also holds Import Equipment, Import Equipment Key Details, Schedule Types, and — when the reading sheet actions module is on — Reading Sheet Reminders and Schedule Import.
Opening a unit's configuration
From Manage Equipment on Location, open a site, then click the blue arrow in the Configure column on the unit. That opens the unit's configuration page, which is organized into tabs:
| Tab | What it does |
|---|---|
| Info | The unit's detail answers (serial number, model, manufacturer, and so on) |
| Reading Sheet | Add, edit, reorder, and deactivate the questions operators answer |
| Schedules | Preventative maintenance schedules for the unit. Only appears when the Schedules module is on |
| Attachments | Files attached to the unit |
| Calculations | Values EZ Ops works out automatically from other answers |
| Copy unit and its reading sheet/calcs. | Copy this unit to one or more other locations |
| External Identifiers | IDs used by other systems |
Sub-units only show Info, Attachments, and External Identifiers. Everything else is configured on the parent unit.
Copy a reading sheet to another location
This is the fastest way to roll out a reading sheet you have already built. Instead of rebuilding the questions on every site, configure one unit properly and copy it.
How to copy
- Open the unit you want to copy and go to the Copy unit and its reading sheet/calcs. tab.
- In Select a Location to Copy it to, start typing. The search matches both field locations and plants, by name or LSD.
- Pick a location from the list, then click Add to copy list. Repeat for every location you want.
- Remove a location from the list with the red X beside its name.
- Set Copy Quantity if you need more than one copy. This creates that many copies on every selected location. The maximum is 20.
- Tick Copy SubUnits if this unit has sub-units that should be copied too.
- Click Copy.
The Copy button stays disabled until at least one location is in the copy list.
What gets copied
| Copied | Not copied |
|---|---|
| The unit itself — name, type, and settings | Schedules |
| Info answers — the values on the unit's Info tab | Attachments |
| The reading sheet and all of its questions | External identifiers |
| Sub-units, only if you tick Copy SubUnits | Logged readings and history |
| Calculations, with one exception (below) |
Info answers are copied. Every answer on the source unit's Info tab — serial number, model, manufacturer, install date, and any custom details — is copied onto the new unit. That is a time-saver for shared values like manufacturer or model, but it means unit-specific values arrive wrong. Serial numbers in particular will be duplicates of the source unit until you correct them.
One kind of calculation is skipped. Calculations that send their result to a different log — another unit's reading sheet, or a plant production log — are not copied. The screen states this: "only calculations that do not move the resulting value to another log will be copied." Those calculations point at a specific destination that does not apply on the new site, so you rebuild them by hand. All other calculations, including chained sub-calculations, are copied and re-pointed at the new unit's own questions.
After you copy
- Rename the copies. Every copy keeps the source unit's exact name. If you copied to five locations you now have five units with identical names. Rename them on each site's equipment list.
- Correct the Info answers that are unit-specific, especially serial numbers.
- Add schedules. Schedules do not copy, so any preventative maintenance has to be set up on each new unit.
- Have operators SYNC. New equipment and reading sheets do not appear in the field until the next sync.
Create a new unit from scratch
Use this when no existing reading sheet is close enough to copy.
- Go to Org Configuration → Equipment & Reading Sheets → Equipment.
- Open Manage Equipment on Location, choose Field Locations or Plants, and click the site.
- Click Create New Equipment.
- Enter a Name and choose a Type. Both are required. The type must already exist — see Equipment types and details.
- Click Create Unit.
- Fill in the unit's Info tab, then build its reading sheet on the Reading Sheet tab.
The unit's reading sheet is created automatically with it. It starts empty, so the next step is always adding questions.
Equipment on the site list
The equipment table on a site lets you edit several things inline. Changes save when you click away from the field.
| Column | What it does |
|---|---|
| Parent Unit | Attaches this unit to another unit as a sub-unit, so both are logged on one reading sheet |
| Type | Changes the equipment type. You are asked to confirm, because it changes which details are tracked |
| Name | Renames the unit |
| Page | The order reading sheets appear in for operators. Only affects parent units |
| State | Running, Out of Service, or Low Use (emissions orgs only) |
Setting a unit to Out of Service hides it and its schedules from the offline app. Use the clock icon on the unit's configuration page to see state history.
Units that share one reading sheet
If two units are logged on the same sheet — for example, two compressors in one building — set one as the parent:
- Create each unit separately on the site.
- On the equipment table, set the Parent Unit dropdown on each sub-unit to the parent.
- Configure the reading sheet, schedules, and calculations on the parent unit only.
- When adding questions, set Associated Sub Unit on each question so exports attribute the reading to the right unit.
Add and edit reading sheet questions
Open the unit and go to the Reading Sheet tab. The panel is headed Edit [unit name] Reading Sheet Interface.
Questions are listed in the order operators see them. Click and drag to rearrange. Use Expand All / Minimize All to open or close every question at once, and the Active / Inactive buttons to switch between questions in use and questions that have been retired.
Add a question
- Click Add New.
- Choose a Key Type.
- Enter an Alias — this is the label operators see.
- Enter Units. Type
texthere if the answer should be free text instead of a number. - Choose a Placement — Start or End of the sheet.
- Set Number to Create if you want several at once (up to 20).
- Click Create, then drag the new questions into position.
Key types
| Key Type | Use it for |
|---|---|
| General | Any measured or recorded value. This is the one you will use most |
| Total Hours | Cumulative lifetime runtime. Drives hours-based schedules. Total hours can never decrease |
| Header Break | A titled divider that groups questions visually. Not an answerable question |
| Normals Question | A fixed yes/no "Operating Normally" check — see below |
Question settings
Click Show More on a question to reach the rest of its settings. A Save button appears on the question as soon as you change something — changes are not saved until you click it.
| Setting | What it does |
|---|---|
| Alias/Title | The label operators see |
| Units | What the value is measured in. Set to text to allow text answers instead of numbers |
| Key Type | Changes the question type |
| Associated Sub Unit | Attributes this reading to a sub-unit, for accurate exports |
| Shift | Restricts the question to AM or PM. Only appears when the plant uses shifts. Leave blank to allow both |
| Manufacturer Min | General questions only. Answers below this automatically email the plant foreman |
| Manufacturer Max | General questions only. Answers above this automatically email the plant foreman |
| Default Value | General questions only. Pre-fills the answer when the operator presses Start Log and nothing is logged yet |
| Drop Options | Turns the question into a dropdown. Create Custom takes comma-separated values, Select List uses an existing drop down list, None removes it |
| Internal Key | Tags the question as a standard measurement (rpm, load_factor, kw_output, and similar) so reports and exports can find it even when units name the question differently. Pick from the suggestions rather than inventing a new value |
The plant foreman address used for min/max alerts is set on the plant's users configuration page.
When shifts are in use, Change all unset selected keys to have a shift of: AM / PM assigns a shift in bulk to every question that does not have one yet.
Retire a question instead of deleting it
There is no delete. The red X on a question deactivates it, and the + on the Inactive list brings it back. Deactivated questions keep their history, which is why removing a question never destroys past readings. The clock icon on a question shows its change history.
Retiring is the safe move on a sheet operators are already using. Changing the units or key type of a live question affects how existing data is interpreted; adding a new question does not.
Normals Question (advanced)
A Normals Question adds a fixed yes/no check to the reading sheet. EZ Ops sets it up for you: the alias becomes Operating Normally, the options are locked to yes and no, and only one can be created at a time.
When an operator answers no, EZ Ops tells them "You have marked this reading sheet as not normal. An autogenerated task will be created on your behalf when you sync to correct this issue." They then complete the organization's Reading Sheet Normals form, which asks What was not normal? and What can be done to fix this?
This requires a Reading Sheet Normals form to exist first, created under Admin → Form Config. An organization can only have one. If it does not exist, the option is blocked with a link to form configuration. Because every "no" generates a task, use this sparingly — it is not recommended for most reading sheets.
Equipment types and details
An equipment type is the category a unit belongs to. The type controls which equipment details are tracked on the unit's Info tab. Those detail answers are what operators see when they tap the info button on a reading sheet, and they are what gets copied when you copy a unit.
Types must exist before you can create equipment.
Set up types
- Go to Org Configuration → Equipment & Reading Sheets → Equipment and open the Equipment Types panel.
- If no types exist yet, click Add Default Equipment Types to load the standard EZ Ops set. This button only appears while the list is empty.
- To add your own, click Create New Equipment Type.
- To rename a type, click the green Edit button on its row.
- To choose which details the type tracks, click the blue arrow in the Configure column.
A type cannot be deleted while any equipment uses it. The Count column includes deleted equipment, so a type that looks unused may still be locked.
Configure a type's details
On the type's configuration page:
- Click Add Equipment Detail, then pick a detail from the dropdown.
- Drag details to reorder them. This is the order they appear on the Info tab.
- Click Save Changes on a detail after changing it.
- Remove Detail takes it off this type.
- Create Custom Equipment Detail adds a new field to your organization's library when nothing suitable exists.
For organizations using MSAPR emissions, details marked as emissions contributors cannot be removed from an emissions type.
The detail library
The Equipment Details panel on the Manage Equipment page lists every detail available, split into EZ Ops Defaults, Custom, and Deleted. Only custom details can be edited, deleted, or restored — EZ Ops defaults are fixed.
Reading sheet calculations
Calculations fill in a reading sheet value automatically from other values, so operators do not do mental math and errors get caught sooner.
Open the unit's Calculations tab and click New Calculation. Each calculation has a description, one or more sub-calculations that each do one arithmetic step, and a result destination — the question on the reading sheet that receives the answer. The result question can be disabled so operators cannot type over it.
| Concept | What to know |
|---|---|
| Basic | Arithmetic between two values: X (+ − × ÷) Y = Z. Either value can be a constant, or the previous log's value |
| Time | The elapsed time between two log entries. Always returns hours |
| Chaining | Up to 4 sub-calculations. Each stores Result 1, Result 2, and so on, which later steps can use as inputs |
| Modify | Applies a conversion factor to the result, for example converting a tank level into a volume |
| Relocate | Sends the result to another unit's reading sheet or a plant production log. These are the calculations that do not copy |
| Average | Averages the result per hour or per day before storing it |
| Schedule reset | A schedule can reset a value to zero when it is completed, such as an oil change resetting an oil hours counter. Up to 4 per schedule |
Calculations that reference the previous log's value need the operator's device to have synced recently.
Deleted calculations are recoverable — switch the Calculations tab from Active to Deleted and restore.
Connecting reading sheets to schedulesHours-based schedules read their runtime from a Total Hours question:
- Set the schedule type to Hourly or Hybrid.
- Select the Total Hours Key — the specific Total Hours question that tracks runtime for that schedule.
- EZ Ops counts hours since the last completion and triggers the schedule at the threshold.
If a total hours value ever needs resetting — after an engine replacement, for example — contact EZ Ops Support at 888-378-4602 ext. 1 or EzopsSupport@Detechtion.com. Total hours drive schedule timing, and a manual reset can trigger or skip maintenance unexpectedly.
Reports| Report | What it shows |
|---|---|
| Export and Edit Reading Sheets | Logged values for a date range, exportable to Excel |
| Equipment Overview | All active equipment across the organization with current state |
| Run Time Report | Accumulated total hours per unit |
"I copied a unit but the schedules didn't come with it" Schedules are not copied. Set them up on each new unit.
"My copies all have the same name" Copying keeps the source unit's name. Rename each copy on its site's equipment list.
"A calculation didn't copy" Calculations that send their result to another log are skipped by design. Rebuild those on the new unit.
"Operators can't see the new equipment or reading sheet" Have them SYNC. Equipment, questions, and configuration changes only reach the field on sync.
"Operators can't enter a value in a question" Check whether the question has a Shift restriction and which shift they are on. Confirm the question is on the Active list, not Inactive. Calculated result questions may be deliberately disabled.
"A calculated value is wrong" Check the order of sub-calculations — chained steps depend on earlier results. If it uses previous-day values, confirm the operator synced recently. Check whether a default value triggered the calculation before real data was entered.
"The plant foreman isn't getting min/max alerts" Confirm the foreman email is set on the plant's users configuration page, and that Manufacturer Min / Max are filled in on the affected questions.
"I can't delete an equipment type" A type cannot be deleted while equipment exists under it, including deleted equipment.
"I need to reset total hours" Contact EZ Ops Support at 888-378-4602 ext. 1 or EzopsSupport@Detechtion.com. Do not adjust these values manually — they drive schedules.
Tips & Recommendations- Build one reading sheet well, then copy it. Getting one unit right and copying it to the rest is faster and far more consistent than configuring each site by hand.
- Always check Info answers after a copy. Serial numbers and other unit-specific values arrive as duplicates of the source unit.
- Configure the reading sheet before operators start using the unit. Adding questions later is fine. Changing units or key types on a question already in use affects how existing data reads.
- Deactivate rather than rebuild. Retiring a question preserves its history; there is no delete, and that is deliberate.
- Use header breaks on long sheets. Grouping questions into sections like "Engine Data" or "Fluid Levels" makes the log faster to complete and easier to check.
- Set manufacturer min and max on critical values. Alerts catch out-of-spec readings without operators needing to know every specification.
- Tag sub-unit questions. Accurate Associated Sub Unit values make exports and reporting far more useful on shared sheets.
- Plan calculations before building them. Map the inputs and the destination first — chaining is powerful but harder to unpick later.