Schedules

PM's for Rotating Equipment, Calibrations, Reminders etc

 What is a Schedule?

Schedules in EZ Ops are a reminder system for recurring work that needs to be completed at locations or on equipment. They track everything from preventive maintenance (PM) and calibrations to safety checks and samples, and alert operators when work is coming due or overdue.

Key point: Schedules run on either a date cycle, an equipment hours cycle, or a hybrid of both — and every completion, deferral, and edit is recorded in full history so nothing is lost.

Why Schedules Matter

Schedules are essential because:

  • Prevent missed maintenance - Automatically flag upcoming and overdue work so nothing slips through
  • Track equipment health - Hours-based schedules tie directly to equipment reading sheets to track runtime
  • Accountability - Every completion, edit, and deferral is logged with the user who made the change and the reason why
  • Documentation - Service documents and notes can be attached to each completion for organized records
  • Reporting - Complete and upcoming schedules can be viewed and exported for compliance and planning
Schedule Categories

Schedules are organized into categories based on what they track:

  • Preventive Maintenance (PM) - Scheduled maintenance work on equipment (engine services, overhauls, oil changes)
  • Calibrations - Instrument and equipment calibrations
  • General - All other recurring work at a location (safety checks, samples, tests)

Note: Schedules on equipment can be categorized as PM, General, or Calibration. Schedules on plants or field locations are always classified as General location schedules.

Schedule Types

EZ Ops supports three schedule types:

  • Date - Runs off a next due date and a set time frequency (e.g., every 30 days, every 6 months)
  • Hours - Runs off total runtime hours on a piece of equipment using a next service hours value and an hourly frequency (e.g., every 250 hours)
  • Hybrid - Uses both a due date and a service hours threshold — whichever comes first triggers the schedule

Date Repetition Types

Date and Hybrid schedules use one of three repetition types, a summary is below:

  • Dynamic - Resets forward from the actual completion date (e.g., always 30 days from when you last finished it)
  • Static - Always resets to the same fixed day of the month (e.g., always the 1st or last day of the month)
  • Window - Tied to a fixed period (month, quarter, or year). The schedule opens at the start of the period and is due at the end. If not completed before the period closes, it becomes delinquent (not overdue) and the missed period is permanently recorded
Warning Periods

Schedules change colour to alert operators before they become overdue:

Default warning periods:

  • Hourly schedules - Turn orange at 5% or less remaining, turn red at 1% or less remaining
  • Date schedules over 60 days - Turn orange at 10 days remaining, turn red at 5 days or fewer remaining
  • Date schedules under 60 days - Turn orange at 4 days remaining, turn red at 2 days or fewer remaining

Custom warning periods can be set on any schedule to give more or less advance notice depending on how much preparation is needed (e.g., engine overhauls need more lead time than routine oil changes).

When to Use Schedules

Schedules are appropriate for any recurring work, including:

  • Engine and equipment services - Oil changes, filter changes, tune-ups at set hour intervals
  • Regulatory calibrations - Meter calibrations required at fixed intervals
  • Safety inspections - Regularly required checks on safety-critical items
  • Sampling - Chemical, fluid, or emissions samples required on a schedule
  • Location-level recurring tasks - Any date-based recurring work at a plant or field location
Schedules with Required Forms

Some schedules are configured to require a form before the schedule can be marked complete. These are Machine Schedule forms (the app form type; older UI and reports may still say "equipment schedule forms"):

  • If a schedule has a required form, you must fill out and submit the form as part of the completion process — the schedule cannot be marked complete without it
  • The form appears automatically when you go to complete the schedule
  • Some form questions can display the previous value from the last time the schedule was completed, making it easy to compare readings over time
  • Completed schedule forms are viewable in the Completed Preventive Maintenance report

If a schedule you are trying to complete requires a form you cannot see or fill out, sync your device and try again — if the issue persists, contact your administrator.

How to Complete a Schedule
  1. Navigate to the schedule - Go to the location or equipment page and find the Schedules section. Overdue and upcoming schedules are highlighted in red and orange
  2. Open the schedule - Click on the schedule to view its details, including past completions and any attached service documents
  3. Complete the required form (if applicable) - If the schedule has a required form, fill it out before you can proceed. See the section above for details
  4. Enter a note (optional) - Add a note to describe what was done or any relevant details about the completion
  5. Attach documents (optional) - Attach service reports, calibration certificates, or photos to keep a permanent record with the completion
  6. Complete the schedule - Click the complete button to log the completion. The schedule will automatically reset based on its frequency and type
How to Defer a Schedule

If work needs to be delayed for operational or cost reasons, you can defer the schedule instead of completing it:

  1. Open the schedule - Navigate to the schedule that needs to be deferred
  2. Select defer - Click the defer option
  3. Enter a reason - A reason is required when deferring — this is recorded permanently in the schedule history
  4. Save the deferral - The deferral is logged with your name, the date, and the reason provided

Note: Deferring does not reset the schedule — the original due date remains. A new completion is still required to reset the schedule.

How to Edit a Schedule

Operators can adjust the due date or frequency of a schedule if needed:

  1. Open the schedule - Navigate to the schedule you need to edit
  2. Click edit - Select the edit option on the schedule
  3. Update the due date or frequency - Adjust as needed (useful after overhauls that require more frequent follow-up services for a period)
  4. Enter a reason - A reason is required for all edits and is logged permanently with your name

EZ Ops keeps a complete history of all changes made to a schedule, including who made the change and when.

Understanding Schedule Colours

The schedule list uses colour to communicate urgency at a glance:

  • No colour - Schedule is not yet near its warning period — no action needed
  • Green - Schedule was completed during the current offline session (before syncing)
  • Orange - Schedule is within its warning period — plan to complete soon
  • Red - Schedule is at or past its due date — complete as soon as possible
  • Delinquent - Applies to Window schedules only — the completion window has closed without a completion being recorded
How to Plan a Schedule

Planning is used when third-party contractors or crews are booked for a specific future date. Setting a planned date ensures operators and foremen see the correct upcoming date in the app rather than the raw due date.

  1. Open the schedule - Navigate to the schedule that needs to be planned
  2. Set a planned date - Enter the date the work is scheduled to occur (e.g., the date the contractor is booked)
  3. Save - The planned date is now visible to all users

How the displayed date is determined: EZ Ops shows the date in this order of priority:

  1. Planned date (if one is set)
  2. Deferred date (if the schedule has been deferred)
  3. Due date (the default)

This means that if you set a planned date, that is the date operators will see — making it easy to communicate confirmed upcoming work across your team.

Attaching Service Documents

Documents can be attached to a schedule at any time — not just at completion:

  • Attach service reports, calibration records, inspection certificates, or photos
  • Documents remain permanently associated with the schedule for future reference
  • Images are viewable offline; other file types require an internet connection to download
Tips & Recommendations
  • Always record a reason when you defer - A documented deferral protects the operator and supports compliance; an undocumented one just looks like missed work.
  • Treat orange as a plan-for date, not a warning to ignore - The warning period exists to give lead time, and a custom warning period can be set per schedule to match the prep each job actually needs.
  • Mark schedules complete as the work is done - Completing a week's worth in one sitting loses the completion dates that reporting depends on.
  • Sync to refresh hours-based schedules - They move when reading sheet data syncs, so an hours-based schedule can look wrong simply because the readings behind it have not uploaded yet.
  • Adjust the frequency after an overhaul - If major work changes the real service interval, edit the frequency and note why rather than deferring the same schedule repeatedly.