What does the Schedule Costs Feature Do

 What the Costs Feature Does

When the Costs module is switched on, equipment schedules gain the ability to record what the work actually cost — both the money spent and the production lost while the equipment was down. EZ Ops compares that against a projected figure an administrator has already set for this kind of job, so over time your organization can see where the estimates hold up and where they do not.

It applies to equipment schedules only. Other things in EZ Ops that mention cost — a Job's Total Cost, a Field Ticket, the cost and hours on a task — are separate and unrelated to this feature.

Where to Find It

Anywhere a schedule appears with enough detail to expand, you will find the cost button:

  • The Schedules panel on a field location or plant page
  • Equipment Overview
  • The Schedules Report

Expand the schedule and look for a button reading Add Cost, or Edit Cost if a cost has already been recorded against it. The button appears on the current schedule while it is still outstanding, and on past occurrences once they have been completed.

Recording a Cost

  1. Expand the schedule and select Add Cost. A window opens headed Add Cost To followed by the equipment name.
  2. Read the Projected Cost figures at the top. These are set by your organization and cannot be changed here.
  3. Fill in the Actual Cost figures underneath with what the job really cost.
  4. Add a Comment if the numbers need explaining — this is where an unusual figure gets its justification, and it holds up to 255 characters.
  5. Select Create.

The button reads Create even when you are editing a cost you recorded earlier. It saves either way.

The four figures

Both the projected and actual halves capture the same four things, and all four accept decimals:

Field What to enter
Cost($) What the work cost in dollars — parts, contractors, whatever your organization counts
Gas Lost(e3m3) Gas not produced because the equipment was down
Condensate Lost(m3) Condensate not produced for the same reason
NGL Lost(m3) Natural gas liquids not produced for the same reason

The three loss figures are the point of the exercise as much as the dollar figure. A cheap repair that took a compressor down for two days can cost far more in lost production than it did in parts, and recording only the dollars hides that.

Where the top of the window shows N/A instead of a projected figure, no projection has been set up for this kind of job. You can still record the actual cost — there is simply nothing to compare it against.

Using It Offline

Recording costs works without a connection. The projected figures come from your last sync, and the actual cost you enter is held on your device and uploaded at your next sync.

Setting up projections and running the cost report are online-only, but neither is something you do in the field.

Common Issues

"There's no Add Cost button on this schedule"

  • The Costs module may not be switched on for your organization, or your role may not include the Costs permission
  • Check the state of the schedule. The button appears on a current schedule that is still outstanding, and on past occurrences that have been completed — not on every row

"The projected cost shows N/A"

  • Nobody has set a projection for this schedule type, location, or piece of equipment. It is not an error, and it does not stop you recording the actual cost
  • If the comparison matters to your organization, ask an administrator to set one up

"I can't change the projected figures"

  • That is deliberate. Projections are set centrally by someone with the Costs Admin permission so that everyone is measured against the same expectation

"I recorded a cost and my supervisor can't see it"

  • Sync. A cost entered in the field sits on your device until then

"The button says Create but I'm editing an existing cost"

  • Known quirk of the wording. It updates the existing record rather than adding a second one

Tips & Recommendations

  • Record the lost production, not just the dollars - The three loss fields are usually where the real cost of downtime sits, and an entry with only a dollar figure understates what the job actually cost the business
  • Use the Comment when you are well off the projection - A figure three times the projected cost with no explanation looks like a typo to whoever reads the report later
  • Enter it while you are still at the site - It works offline, and the numbers are never as clear a week later
  • Do not guess a loss figure - Leaving a field blank is more honest than filling it with a round number someone will later treat as measured

Remember: This records what a piece of equipment's scheduled work actually cost, in both dollars and lost production. It has nothing to do with Job costs or Field Tickets.